医生把我弄高潮十几次,国产成人艳妇aa视频在线,8888国产精华最好的产品,调教 打开双腿鞭打

四川礦山

Service hotline:18989281813
Home>News>Industry News

Approved Badaling Yueling section of Beijing to Zhangjiakou Railway a total investment of 1749000000 yuan

2015-03-02
The national development and Reform Commission approved the feasibility study report of the new Beijing to Badaling Railway Engineering Zhangjiakou mt.section. To start the project, will be conducive to accelerate the construction of Beijing Zhang railway passage, as soon as possible to play project overall efficiency, promote the coordinated development of Beijing Tianjin hebei.
Badaling Yueling section project itself Yong Guan tunnel entrance to the tunnel exit, Badaling, a total length of 15.44 kilometers, of which Badaling tunnel length of about 12 km, 3 km long pass tunnel.
The main technical standards of Railway Passenger Dedicated Line Project: level. Number of main lines: double. Passenger train the target value of speed: 250 km / h. The minimum radius of curve: the general area of 4000 meters, 3500 meters of difficult section. The limiting slope: 20 per thousand, local site by traffic calculation can not greater than 30 per thousand. Traction type: electric power. Methods: automatic train operation control. Traffic control mode: ctc.
The project total investment of 1749000000 yuan. Capital accounts for 50% of the total investment, the city of Beijing in charge of land demolition work and cost, demolishment expense by the parties concerned after the approval of Beijing city as capital included in capital shares, the rest by the railway company responsible for raising. Outside the capital funds to use domestic bank loans to solve. The period of project investment in the Beijing Zhang railway construction investment.

Back

主站蜘蛛池模板: 新密市| 米泉市| 滦平县| 吉木萨尔县| 华宁县| 五峰| 泗洪县| 沈丘县| 隆子县| 峨边| 金乡县| 安国市| 竹北市| 徐闻县| 南投市| 昔阳县| 鄂尔多斯市| 兴和县| 安阳市| 连云港市| 沧源| 峨边| 武冈市| 罗甸县| 双辽市| 乌拉特前旗| 毕节市| 合江县| 丰台区| 宕昌县| 富阳市| 永顺县| 娱乐| 简阳市| 炎陵县| 佛教| 博爱县| 大荔县| 仁化县| 钦州市| 抚宁县|